Waukesha generator sets on the plant floor

Power generation · in progress

10.5 MW Waukesha retrofit and relocation

Retrofit and relocation of a 10.5 MW plant of Waukesha gas engine generators, part of the 25 MW of reciprocating engine generation we currently have in production.

Capacity
10.5 MW
Engines
Waukesha gas engine generators
Status
In progress
Power generation capabilities
Enclosed generator package

Cogeneration · Capstone microturbines

Microturbine cogeneration from 25 kW to 200 kW

Combined heat and power systems built around Capstone microturbines for greenhouses, commercial buildings, manufacturing and gas plants.

Projects include a Capstone C30 for a greenhouse, complete with automation systems; a Capstone C30 for a factory in Calgary; a 25 kW unit for Bow Valley Credit Union; a 100 kW system on order; and 200 kW units for gas plants.

Greenhouse
Capstone C30 with automation
Factory, Calgary
Capstone C30
Bow Valley Credit Union
25 kW
On order
100 kW
Gas plants
200 kW units
Cogeneration
Steam turbine generator package

Steam turbine generator · NorthRiver Midstream

3.5 MW steam turbine generator engineering, McMahon Gas Plant

Engineering for a 3.5 MW Triveni steam turbine generator package at NorthRiver Midstream's McMahon Gas Plant near Taylor, BC, working alongside Triveni Turbine and the owner's engineer.

Our scope covered 30% design (3D model, pipe stress and skid analysis, valve and component datasheets, EIC including PLC programming, P&IDs, PFD, line list, single line diagram, I/O list and control narrative), the RFQ package and technical bid evaluation for package fabrication, MCC procurement support, HAZOP attendance, and BC P.Eng. stamping of the issued-for-construction documents.

Client
NorthRiver Midstream
Site
McMahon Gas Plant, Taylor BC
Equipment
3.5 MW Triveni steam turbine generator
Scope
Engineering, procurement support, HAZOP, P.Eng. stamping
Steam turbines
Steam turbine generator

Steam turbine generator · CSV Midstream

3.1 MW back-pressure steam turbine generator, Albright Gas Plant

Supply of a 3.1 MW back-pressure steam turbine generator for CSV Midstream's Albright Gas Plant in northwest Alberta, recovering power from 55,000 kg/h of process steam.

The Howden CBA7 package takes steam at 4,400 kPa(g) and 257 °C and exhausts at 450 kPa(g) back to the plant, producing about 3 MW at the generator terminals. It included a Woodward 505 governor, DECS-250 excitation control, closed-loop cooling, an air-conditioned enclosure, utility-grade generator protection and power export limiting, with CSA certification.

Client
CSV Midstream (CSV Albright LP)
Output
3.1 MW at the coupling
Steam flow
55,000 kg/h
Delivered
2024
Steam turbines

Have a project in mind?